Urgent: the cloister
Partial restoration of the eastern gallery of
the cloister (in progress)
OBJECTIVE: Repair of the joints,
installation of trusses, distemper the arches, walls and vaults
...
FINANCE: OBTAINED
(40% State and privately funded, particularly thanks to ASMVAL)
Achèvement de la galerie Est du cloître
Finalising repair of the eastern gallery
of the cloister.
FINANCE: OBTAINED
(40% State and private funds, thanks to ASMVAL)
Restoration of the gutters and plumbing
system
OBJECTIVE:
Making watertight, creation of REGARDS, repair of the guttering
grilles, relinking of the system ...
COST: €51,000
Restoration of the floor in the four
galleries
OBJECTIVE:
removal of terra cotta and cut stone, disbursement of sols
fourniture and laying of terracotta and cut stone.
COST: €71,300
Restoration of the masonry in the north,
west and south galleries
OBJECTIVE:
Repair of the joints, pose de tirants, badigeons sur les piles,
the arches, the walls, the vaults ...
COST: about €80,000 per gallery
Restoration of the frameworks and coverings of
the north, west and south galleries
OBJECTIVE:
Removal of the roof, partial removal of the framework, repair of
the covering.
COST: about €400,000