Saint Mary’s Lagrasse
Building works
Cultural influence

Urgent: the cloister

Partial restoration of the eastern gallery of the cloister (in progress)




OBJECTIVE: Repair of the joints, installation of trusses, distemper the arches, walls and vaults ...

FINANCE: OBTAINED
(40% State and privately funded, particularly thanks to ASMVAL)








DETAIL OF THE DAMAGE

Achèvement de la galerie Est du cloître

Finalising repair of the eastern gallery of the cloister.

FINANCE: OBTAINED
(40% State and private funds, thanks to ASMVAL)

Restoration of the gutters and plumbing system

OBJECTIVE: Making watertight, creation of REGARDS, repair of the guttering grilles, relinking of the system ...

COST: €51,000

Restoration of the floor in the four galleries

galeries Ouest et Sud

OBJECTIVE: removal of terra cotta and cut stone, disbursement of sols fourniture and laying of terracotta and cut stone.



COST: €71,300

Restoration of the masonry in the north, west and south galleries

OBJECTIVE: Repair of the joints, pose de tirants, badigeons sur les piles, the arches, the walls, the vaults ...

COST: about €80,000 per gallery

Restoration of the frameworks and coverings of the north, west and south galleries

OBJECTIVE: Removal of the roof, partial removal of the framework, repair of the covering.

COST: about €400,000